Contact
Find us
- 7th Floor, Forum House,
15-18 Lime St, London EC3M 7AN
© 2024 RCK Partners - Company House No: 12396021
The project objective was to manufacture highly advanced conveying systems for subterranean transport of material swarf from several high-speed machining operations to a single destination.
The company developed advanced electro-mechanical devices that reduced swarf losses whilst maintaining conveyor throughput. This was further integrated into the existing control schemes for the high-speed machining systems that automated swarf disposal into the waste management system.
See R&D Tax Relief webpage